Sheet 01 — Islamabad · Rawalpindi
From plan drawing to priced BOQ, with every number traced.
Upload your plan, pin your plot and check what Naqsha read. You get a cost range for your house, built from today's local rates, real quantities and named sources.
- Project
- House, Bahria Town
- Scale
- 1:100
- Plan
- v1 locked
- Rates
- 06 Oct 26
How it works
Four steps, in the order a site engineer would take them.
- 01
Pin the plot
Your location sets the units, rates and building rules, including which marla applies.
- 02
Upload the plan
DXF and vector PDF are read exactly. Scans and photos are read with OCR and AI.
- 03
Check what we read
Rooms, walls and openings appear on your drawing. Fix anything uncertain, then lock.
- 04
Get a range and BOQ
Low, base and high cost with quantities, rates and the source of every line.
Every number traced
Open any line and see how it was worked out.
The formula, each parameter with where it came from, and the rate with its sources and age. Values the machine read are marked ◇, values you confirmed ■, assumptions △ — and every parameter names its source.
net_volume = gross_area − deductions (× thickness) = 376.59 m² − 39.76 m² → 77 m³ bricks = net_volume × 1,371.5 /m³ × (1 + wastage) = 36,963 nos cement = 103 bags · sand = 21.07 m³
- brick_l
- 0.22225 m Spec · brick_a_class
- joint
- 0.01 m Country pack · PK
- mix_sand
- 6 Country pack · PK
- wastage_pct
- 5% Country pack · PK
Honest ranges
The more you give, the tighter the range.
Construction costs overrun more often than they underrun, so the range leans high. A verified plan narrows it. A structural drawing and a soil report narrow it further.
L1Preview only
Plan not verified
−30%+40%L2Final estimate
Verified plan + quality tier + fresh rates
−15%+20%L3Tightest range
+ structural drawing, soil report, finishes
−10%+15%
Coverage · who it's for
Live in Islamabad and Rawalpindi. Other cities join the waitlist.
Homeowners
Know what your house will cost before you sign with a contractor — as a range you can plan around, with the assumptions written down.
Architects
Give clients a priced BOQ from your own drawing in minutes, with the trace to defend every line in a meeting.
Contractors
Check quantities against your own takeoff, see the rate sources and dates, and spot where a quote is high or low.