Skip to main content
NaqshaSign inStart an estimate

Sheet 01 — Islamabad · Rawalpindi

From plan drawing to priced BOQ, with every number traced.

Upload your plan, pin your plot and check what Naqsha read. You get a cost range for your house, built from today's local rates, real quantities and named sources.

DXF · PDF · JPG · PNGRates checked weekly in Islamabad-Rawalpindi
Ground floor · 5 marla · 25′ × 45′ AI read · 10 spaces
45′-0″12′-0″15′-0″12′-0″6′-0″25′-0″30′ roadCar porch12′-0″ × 11′-0″Drawing12′-0″ × 14′-0″Lounge15′-0″ × 14′-0″Kitchen9′-0″ × 11′-0″Stair6×11Bed room 112′-0″ × 14′-6″Bath 16×7Dress6×11Bed room 211′-4″ × 10′-6″Δ 5.6%Bath 26×7
Project
House, Bahria Town
Scale
1:100
Plan
v1 locked
Rates
06 Oct 26
Complete construction · StandardPKR 10,689,353

How it works

Four steps, in the order a site engineer would take them.

  1. 01

    Pin the plot

    Your location sets the units, rates and building rules, including which marla applies.

  2. 02

    Upload the plan

    DXF and vector PDF are read exactly. Scans and photos are read with OCR and AI.

  3. 03

    Check what we read

    Rooms, walls and openings appear on your drawing. Fix anything uncertain, then lock.

  4. 04

    Get a range and BOQ

    Low, base and high cost with quantities, rates and the source of every line.

Every number traced

Open any line and see how it was worked out.

The formula, each parameter with where it came from, and the rate with its sources and age. Values the machine read are marked ◇, values you confirmed ■, assumptions △ — and every parameter names its source.

Brick masonry 0.2286 m in superstructure (external and main internal walls), mortar 1:6PKR 901,8882,719 cft × 331.67Published
Formula
net_volume = gross_area − deductions (× thickness)
  = 376.59 m² − 39.76 m² → 77 m³
bricks = net_volume × 1,371.5 /m³ × (1 + wastage)
  = 36,963 nos
cement = 103 bags · sand = 21.07 m³
Parameters
brick_l
0.22225 m Spec · brick_a_class
joint
0.01 m Country pack · PK
mix_sand
6 Country pack · PK
wastage_pct
5% Country pack · PK

Honest ranges

The more you give, the tighter the range.

Construction costs overrun more often than they underrun, so the range leans high. A verified plan narrows it. A structural drawing and a soil report narrow it further.

Coverage · who it's for

Live in Islamabad and Rawalpindi. Other cities join the waitlist.

Homeowners

Know what your house will cost before you sign with a contractor — as a range you can plan around, with the assumptions written down.

Architects

Give clients a priced BOQ from your own drawing in minutes, with the trace to defend every line in a meeting.

Contractors

Check quantities against your own takeoff, see the rate sources and dates, and spot where a quote is high or low.

Islamabad · availableRawalpindi · availableLahore · waitlistKarachi · waitlistCheck your plot